COP I.1
269
"Bon Accord"
Bill of Quantities for the erection of the proposed Clock Tower to the Blake Pier, Hongkong.
April, 1901.
Hongkong.
*
Excavation and Drains.
Excavate to foundations, part fill and ram, remainder carted away
369.00 cubes @ $3.00 = $1,107
Portland cement: concrete in foundations composed of one part cement, one part sand and five hard stone broken to pass 1" ring
238.00 @ $3.00 = $714
Granite rubble, bedded in cement
37.60 @ $3.00 = $112.80, 81.00 @ $3.00 = $243, Total = $355.80
Hard dry stone material, filled in under floors and well rammed
53.00 @ $1.60 = $84.80
Drains.
4" Glazed stoneware socketed drain pipe, jointed in cement and laid to fall
134 Feet @ $0.70 = $93.80
Extra to 4" Bends
9 @ $1.80 = $16.20
6" Intercepting Trap, with cleansing arm
1 @ $25.00 = $25.00
4" Gulleys and brickwork in cement; Inspection chambers, built of 9" brickwork in cement; and include tooled granite cover
2 @ $18.00 = $36.00, 1 @ $20.00 = $20.00
Bricklayer.
Brickwork in cement mortar
To Summary
219.00 cubes @ $30.00 = $6,570, Cement concrete filling above done
21.10 @ $14.00 = $295.40, 15.00 @ $27.50 = $412.50, Total = $707.90
316.50 @ $3.85 = $1,218.53
1-1/3" steel joists and centering
Extra to facing with glazed bricks
3/4" Cement rendering
Tile paving grouted in cement
Cement skirting 12" high
Balusters 12.9" high
21.6"
Granite sink on and including two half-brick walls in cement
Air bricks for Vent. Lav. 4 W.Ds.
10.85 @ $28.00 = $303.80
287 @ $1.378 = $395.33, 3 ft. @ $0.35 = $1.05, Total = $396.38
344.50 @ $1.02 = $351.39, 3 gs. @ $8.00 = $24.00, Total = $375.39
84 @ $8.60 = $722.40
238 @ $8.00 = $1,904, 9.60 @ $47.15 = $452.64, Total = $2,356.64
Sq. Ft.
30 @ $2.93 = $87.90, 140 @ $1.63 = $228.20, Total = $316.10
Lin. ft.
15 @ $0.24 = $3.60, 145 @ $0.48 = $69.60, Total = $73.20
No.
80 @ $0.38 = $30.40, 38 @ $1.00 = $38.00, 1 @ $9.00 = $9.00, 9 @ $12.00 = $108.00, 12 @ $50.00 = $600.00
Continued.
$8,885.35
COP I.1
269
"Bon Accord"u
Bill of Quantities for the sraction of the proposed Clock Tower to
the Blake Pier, Hongkong.
April, 1901. ›
Hongkong.›
*
Excavation and Drains.'
Excavate to foundations, part fill and raa, remainder: sarted away
369.00 cubes 3.00
$ 1,107
Portland cement: concrete in foundations composed of one part cement, one part sand and five hard stone broken to pass 1" ring | 238.00 Granite rubble, bedded in cement
37.60
81.00 ► 33:00
6,490 1,403
Hard dry stone material, filled is under: floors and well ranned:
53.00-
1.60
78
Drains.1
4 Glazed stoneware 'socketted drain pipe, jointed in cement: and laid to fall
**
do.
Extra to 4*: Bends:
do.
do.1
*6* Intaroapting Trap, with oleansing aru
4* Gulleys and brickwork in sement: Inspection chambers, built of 9* brick- work in cement; and include tooled granite cover:
Bricklayer.
Bricklayer and -Mason.`
Brickwork in cement. mortar:
Lin,
134 Feet
70
9
180.1
#
1.80
*SES
25.
33 50
..40-
2 180:
175.
6 775.
1 20:
1
4:50
4*
#
5.00
20
2
20:00
To Summary
40 9,193 75.
219.00 bubes 30,00-
3,570
Cement concrete filling above done
do.
do.
to form floor
do.
21.10- 14,00
15.00
27.50
316 50
385
but around.
1*
1-1/3*
do.
do.1
do.: 2*.0*:
steel joista and centering“ Extra to facing with glazed bricks 3/4* Cement rendering
Tile paving grouted in cement
Coment skirting" 12" high
Balusters 12.9" high
do 21.6*.
Granite siak on and including two half-
<brick walls in cement:
Air: bricks for Vent.Lav.4 W.Ds."
10.85
*
28.00:
287
1378 3.ft. 35.
344 50
102 3gs. 8.00:
84
to form floor
28.00
W 8.60
238
do.1
under: da. 1
8.00-
9.60-
47 150:
978
Sq. Ft.
30:
293140
163
Lin, fo
15.
24'145.
48
128
No.!
80:
38
1
9
12
50
Continued.?
$
8,885 35
No comments yet.