"Bon Accord"

Bill of Quantities for the erection of the proposed Clock Tower to the Blake Pier, Hongkong.

April, 1901.

Hongkong.

*

Excavation and Drains.

Excavate to foundations, part fill and ram, remainder carted away

369.00 cubes @ $3.00 = $1,107

Portland cement: concrete in foundations composed of one part cement, one part sand and five hard stone broken to pass 1" ring

238.00 @ $3.00 = $714

Granite rubble, bedded in cement

37.60 @ $3.00 = $112.80, 81.00 @ $3.00 = $243, Total = $355.80

Hard dry stone material, filled in under floors and well rammed

53.00 @ $1.60 = $84.80

Drains.

4" Glazed stoneware socketed drain pipe, jointed in cement and laid to fall

134 Feet @ $0.70 = $93.80

Extra to 4" Bends

9 @ $1.80 = $16.20

6" Intercepting Trap, with cleansing arm

1 @ $25.00 = $25.00

4" Gulleys and brickwork in cement; Inspection chambers, built of 9" brickwork in cement; and include tooled granite cover

2 @ $18.00 = $36.00, 1 @ $20.00 = $20.00

Bricklayer.

Brickwork in cement mortar

To Summary

219.00 cubes @ $30.00 = $6,570, Cement concrete filling above done

21.10 @ $14.00 = $295.40, 15.00 @ $27.50 = $412.50, Total = $707.90

316.50 @ $3.85 = $1,218.53

1-1/3" steel joists and centering

Extra to facing with glazed bricks

3/4" Cement rendering

Tile paving grouted in cement

Cement skirting 12" high

Balusters 12.9" high

21.6"

Granite sink on and including two half-brick walls in cement

Air bricks for Vent. Lav. 4 W.Ds.

10.85 @ $28.00 = $303.80

287 @ $1.378 = $395.33, 3 ft. @ $0.35 = $1.05, Total = $396.38

344.50 @ $1.02 = $351.39, 3 gs. @ $8.00 = $24.00, Total = $375.39

84 @ $8.60 = $722.40

238 @ $8.00 = $1,904, 9.60 @ $47.15 = $452.64, Total = $2,356.64

Sq. Ft.

30 @ $2.93 = $87.90, 140 @ $1.63 = $228.20, Total = $316.10

Lin. ft.

15 @ $0.24 = $3.60, 145 @ $0.48 = $69.60, Total = $73.20

No.

80 @ $0.38 = $30.40, 38 @ $1.00 = $38.00, 1 @ $9.00 = $9.00, 9 @ $12.00 = $108.00, 12 @ $50.00 = $600.00

Continued.

$8,885.35

Edit History

2026-05-31 18:20:03 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
COP I.1 269 "Bon Accord" Bill of Quantities for the erection of the proposed Clock Tower to the Blake Pier, Hongkong. April, 1901. Hongkong. * Excavation and Drains. Excavate to foundations, part fill and ram, remainder carted away 369.00 cubes @ $3.00 = $1,107 Portland cement: concrete in foundations composed of one part cement, one part sand and five hard stone broken to pass 1" ring 238.00 @ $3.00 = $714 Granite rubble, bedded in cement 37.60 @ $3.00 = $112.80, 81.00 @ $3.00 = $243, Total = $355.80 Hard dry stone material, filled in under floors and well rammed 53.00 @ $1.60 = $84.80 Drains. 4" Glazed stoneware socketed drain pipe, jointed in cement and laid to fall 134 Feet @ $0.70 = $93.80 Extra to 4" Bends 9 @ $1.80 = $16.20 6" Intercepting Trap, with cleansing arm 1 @ $25.00 = $25.00 4" Gulleys and brickwork in cement; Inspection chambers, built of 9" brickwork in cement; and include tooled granite cover 2 @ $18.00 = $36.00, 1 @ $20.00 = $20.00 Bricklayer. Brickwork in cement mortar To Summary 219.00 cubes @ $30.00 = $6,570, Cement concrete filling above done 21.10 @ $14.00 = $295.40, 15.00 @ $27.50 = $412.50, Total = $707.90 316.50 @ $3.85 = $1,218.53 1-1/3" steel joists and centering Extra to facing with glazed bricks 3/4" Cement rendering Tile paving grouted in cement Cement skirting 12" high Balusters 12.9" high 21.6" Granite sink on and including two half-brick walls in cement Air bricks for Vent. Lav. 4 W.Ds. 10.85 @ $28.00 = $303.80 287 @ $1.378 = $395.33, 3 ft. @ $0.35 = $1.05, Total = $396.38 344.50 @ $1.02 = $351.39, 3 gs. @ $8.00 = $24.00, Total = $375.39 84 @ $8.60 = $722.40 238 @ $8.00 = $1,904, 9.60 @ $47.15 = $452.64, Total = $2,356.64 Sq. Ft. 30 @ $2.93 = $87.90, 140 @ $1.63 = $228.20, Total = $316.10 Lin. ft. 15 @ $0.24 = $3.60, 145 @ $0.48 = $69.60, Total = $73.20 No. 80 @ $0.38 = $30.40, 38 @ $1.00 = $38.00, 1 @ $9.00 = $9.00, 9 @ $12.00 = $108.00, 12 @ $50.00 = $600.00 Continued. $8,885.35
Baseline (Original)
COP I.1 269 "Bon Accord"u Bill of Quantities for the sraction of the proposed Clock Tower to the Blake Pier, Hongkong. April, 1901. Hongkong.› * Excavation and Drains.' Excavate to foundations, part fill and raa, remainder: sarted away 369.00 cubes 3.00 $ 1,107 Portland cement: concrete in foundations composed of one part cement, one part sand and five hard stone broken to pass 1" ring | 238.00 Granite rubble, bedded in cement 37.60 81.00 33:00 6,490 1,403 Hard dry stone material, filled is under: floors and well ranned: 53.00- 1.60 78 Drains.1 4 Glazed stoneware 'socketted drain pipe, jointed in cement: and laid to fall ** do. Extra to 4*: Bends: do. do.1 *6* Intaroapting Trap, with oleansing aru 4* Gulleys and brickwork in sement: Inspection chambers, built of 9* brick- work in cement; and include tooled granite cover: Bricklayer. Bricklayer and -Mason.` Brickwork in cement. mortar: Lin, 134 Feet 70 9 180.1 # 1.80 *SES 25. 33 50 ..40- 2 180: 175. 6 775. 1 20: 1 4:50 4* # 5.00 20 2 20:00 To Summary 40 9,193 75. 219.00 bubes 30,00- 3,570 Cement concrete filling above done do. do. to form floor do. 21.10- 14,00 15.00 27.50 316 50 385 but around. 1* 1-1/3* do. do.1 do.: 2*.0*: steel joista and centering“ Extra to facing with glazed bricks 3/4* Cement rendering Tile paving grouted in cement Coment skirting" 12" high Balusters 12.9" high do 21.6*. Granite siak on and including two half- <brick walls in cement: Air: bricks for Vent.Lav.4 W.Ds." 10.85 * 28.00: 287 1378 3.ft. 35. 344 50 102 3gs. 8.00: 84 to form floor 28.00 W 8.60 238 do.1 under: da. 1 8.00- 9.60- 47 150: 978 Sq. Ft. 30: 293140 163 Lin, fo 15. 24'145. 48 128 No.! 80: 38 1 9 12 50 Continued.? $ 8,885 35
2026-05-31 18:20:03 · Baseline
View content

COP I.1

269

"Bon Accord"u

Bill of Quantities for the sraction of the proposed Clock Tower to

the Blake Pier, Hongkong.

April, 1901. ›

Hongkong.›

*

Excavation and Drains.'

Excavate to foundations, part fill and raa, remainder: sarted away

369.00 cubes 3.00

$ 1,107

Portland cement: concrete in foundations composed of one part cement, one part sand and five hard stone broken to pass 1" ring | 238.00 Granite rubble, bedded in cement

37.60

81.00 ► 33:00

6,490 1,403

Hard dry stone material, filled is under: floors and well ranned:

53.00-

1.60

78

Drains.1

4 Glazed stoneware 'socketted drain pipe, jointed in cement: and laid to fall

**

do.

Extra to 4*: Bends:

do.

do.1

*6* Intaroapting Trap, with oleansing aru

4* Gulleys and brickwork in sement: Inspection chambers, built of 9* brick- work in cement; and include tooled granite cover:

Bricklayer.

Bricklayer and -Mason.`

Brickwork in cement. mortar:

Lin,

134 Feet

70

9

180.1

#

1.80

*SES

25.

33 50

..40-

2 180:

175.

6 775.

1 20:

1

4:50

4*

#

5.00

20

2

20:00

To Summary

40 9,193 75.

219.00 bubes 30,00-

3,570

Cement concrete filling above done

do.

do.

to form floor

do.

21.10- 14,00

15.00

27.50

316 50

385

but around.

1*

1-1/3*

do.

do.1

do.: 2*.0*:

steel joista and centering“ Extra to facing with glazed bricks 3/4* Cement rendering

Tile paving grouted in cement

Coment skirting" 12" high

Balusters 12.9" high

do 21.6*.

Granite siak on and including two half-

<brick walls in cement:

Air: bricks for Vent.Lav.4 W.Ds."

10.85

*

28.00:

287

1378 3.ft. 35.

344 50

102 3gs. 8.00:

84

to form floor

28.00

W 8.60

238

do.1

under: da. 1

8.00-

9.60-

47 150:

978

Sq. Ft.

30:

293140

163

Lin, fo

15.

24'145.

48

128

No.!

80:

38

1

9

12

50

Continued.?

$

8,885 35

Comments